MANGO PROJECT RFQ BRIEF — blank buyer worksheet Version: 2026-11-05 | mangopulpprocessingline.com This worksheet contains no measured project results or equipment guarantees. Purchase task: [whole mango line / concentration / treatment and aseptic filling] Incoming material and handover point: Cultivar/local name, origin, lot and season: Maturity or firmness method and accepted range: Fruit size, defects, peel/stone observations: Capacity: value, unit and measurement point (whole fruit / pulp / concentrate): Product specification and assessment method/temperature: Destoner trial: fruit lot, settings, pulp/peel/stones, attached flesh/fragments: Finisher trial: feed, first/second screen, texture, product/residue masses: Mass balance: accepted feed, additions, pulp, peel, stones, residue, samples, hold-up: Concentration: feed flow, feed/target solids on same basis, viscosity: Package: bag volume, fitment, supporting container and handling: Existing equipment to retain and interface conditions: Utilities available at connection, layout and access: Equipment/supply scope and exclusions (use the scope CSV): FAT/SAT: material, duration, instruments, samples, criteria, witnesses, deviations: Validation, installation, commissioning and release responsibilities: Schedule and unresolved project confirmations: The Watani manufacturer report is reference context. It is not this worksheet's trial or acceptance evidence. Fill only known values; mark others for project confirmation.